Job No.:

2015-008

Services: 

Concrete, Earthwork, Asphalt

Owner: 

City of El Paso – Capital Improvements Department

Status:

Started January 5, 2015 – Completed

Scope of Work

Project consisted of installation/replacement of sidewalk and landscaping along Santa Fe St. between Main Dr. and San Antonio Ave. Pedestrian facilities to be installed with this project consist of widening of the sidewalk at the northeast corner of the intersection with San Antonio, new curb and gutter, new ADA accessible curb ramps, new stamped/colored crosswalks, introduction of landscaping elements such as 3” caliper trees with grates, new irrigation system, and new street lights typical to the ones located in the downtown area.

Original Contract Time: 90 calendar days (3 months)

Completion Time: 3 months (on time)

Major Subcontractors/Suppliers:

Prime Irrigation & Landscape, Code Electric, Pavement Markings Inc., Paso del Norte Materials.

MORE PROJECTS

  • Loop 375 Widening
  • Independence Dr Pedestrian and Bicycle Enhancements
  • Pedestrian Crossings
  • River Bend Dr Pedestrian and Bicycle Enhancements
  • Pedestrian Pathway Improvements Phase 1.2B
  • Pedestrian Pathway Improvements Phase 1.2A
  • Scenic Drive
  • Pedestrian Pathway Improvements Phase 2.1
  • El Paso Int. Airport Runway
  • Roundabouts
  • City Site Work