Santa Fe Pedestrian Improvements

Job No.:

2015-008

Services: 

Concrete, Earthwork, Asphalt

Owner: 

City of El Paso – Capital Improvements Department

Status:

Started January 5, 2015 – Completed

Scope of Work

Project consisted of installation/replacement of sidewalk and landscaping along Santa Fe St. between Main Dr. and San Antonio Ave. Pedestrian facilities to be installed with this project consist of widening of the sidewalk at the northeast corner of the intersection with San Antonio, new curb and gutter, new ADA accessible curb ramps, new stamped/colored crosswalks, introduction of landscaping elements such as 3” caliper trees with grates, new irrigation system, and new street lights typical to the ones located in the downtown area.

Original Contract Time: 90 calendar days (3 months)

Completion Time: 3 months (on time)

Major Subcontractors/Suppliers:

Prime Irrigation & Landscape, Code Electric, Pavement Markings Inc., Paso del Norte Materials.

MORE PROJECTS

  • Pedestrian Pathway Improvements Phase 1.2A
  • Roundabouts
  • Pedestrian Crossings
  • Scenic Drive
  • Independence Dr Pedestrian and Bicycle Enhancements
  • El Paso Int. Airport Runway
  • Pedestrian Pathway Improvements Phase 1.2B
  • River Bend Dr Pedestrian and Bicycle Enhancements
  • Pedestrian Pathway Improvements Phase 2.1
  • Loop 375 Widening
  • City Site Work

Independence Dr Pedestrian and Bicycle Enhancements

Job No.:

2015-828

Services: 

Concrete, Asphalt, Earthwork

Owner: 

City of El Paso – Capital Improvements Department

Status:

Started February 8, 2016

Scope of Work:

The project supports the development of a pedestrian and bicycle corridor along Independence Dr. between Yarbrough Dr. and Whittier Dr. The project consists of a 14 ft. pedestrian and bicycle path with shade trees, vegetation and other amenities.  The corridor will provide connectivity to several existing neighborhoods, J.P. Shawyer Park, and the existing Yarbrough Dr. bike lane. The total length of the pedestrian and bicycle corridor project is 4,765 feet and runs parallel to Independence Dr.

Original Contract Time:

161 calendar days (5 ½ months)    Anticipated Completion Time: 4 months

Major Subcontractors/Suppliers:

Accent Landscape Contractors, Code Electric, Bowen Industrial Contractors, Pavement Markings Inc., Paso Del Norte Materials, CEMEX.

SIMILAR PROJECTS

  • City Site Work
  • Pedestrian Pathway Improvements Phase 1.2A
  • Scenic Drive
  • Roundabouts
  • Pedestrian Pathway Improvements Phase 1.2B
  • Loop 375 Widening
  • Pedestrian Pathway Improvements Phase 2.1
  • El Paso Int. Airport Runway
  • Pedestrian Crossings
  • Santa Fe Pedestrian Improvements
  • River Bend Dr Pedestrian and Bicycle Enhancements

River Bend Dr Pedestrian and Bicycle Enhancements

Job No:

2015-780

Services:

Concrete, Asphalt, Earthwork, Utilities

Owner: 

City of El Paso – Capital Improvements Department

Status:

Started February 12, 2016

Scope of Work:

The project supports the development of a pedestrian and bicycle corridor along River Bend Dr. between Frontera Rd. and Turnstone Dr. The project consists of a 12 ft. pedestrian and bicycle path with shade trees, vegetation and other amenities.  The corridor will provide connectivity to several existing neighborhoods, Braden Aboud Park and Zach White Elementary School. The total length of the pedestrian and bicycle corridor project is 5,633 feet and runs parallel to River Bend Dr.

Original Contract Time:

193 calendar days (6 ½ months)    Anticipated Completion Time: 5 months

Major Subcontractors/Suppliers:

Accent Landscape Contractors, Code Electric, Bowen Industrial Contractors, Pavement Markings Inc., Vertex Contractors, Paso Del Norte Materials, CEMEX.

SIMILAR PROJECTS

  • Pedestrian Crossings
  • Loop 375 Widening
  • Pedestrian Pathway Improvements Phase 1.2A
  • Pedestrian Pathway Improvements Phase 1.2B
  • Pedestrian Pathway Improvements Phase 2.1
  • City Site Work
  • Santa Fe Pedestrian Improvements
  • Scenic Drive
  • Independence Dr Pedestrian and Bicycle Enhancements
  • Roundabouts
  • El Paso Int. Airport Runway

Loop 375 Widening

CN:

2552-03-054

Services:

Concrete, Asphalt, Earthwork, Utilities

Owner:

TXDOT

Status:

Started March 28, 2016

Scope of Work:

Project consists of the construction of an additional travel lane in both directions on Loop 375, an auxiliary lane, high mast illumination, signing, pavement markings, delineators, metal beam guard fence adjustment and frontage road sidewalks.

Original Contract Time:

452 working days (20 months)    Anticipated Completion Time: 14 months

Major Subcontractors/Suppliers:

Tri-State Electric, Pavement Markings Inc., Traffic Control Specialist, Vertex Contractors, EGL Construction, Texas Far West, A-Brothers, Hardy Hole Drilling, South Texas Painting, Paso Del Norte Materials, CEMEX, Castillo Prestress.

SIMILAR PROJECTS

  • Roundabouts
  • City Site Work
  • El Paso Int. Airport Runway
  • Pedestrian Pathway Improvements Phase 1.2B
  • River Bend Dr Pedestrian and Bicycle Enhancements
  • Independence Dr Pedestrian and Bicycle Enhancements
  • Santa Fe Pedestrian Improvements
  • Pedestrian Pathway Improvements Phase 2.1
  • Pedestrian Crossings
  • Scenic Drive
  • Pedestrian Pathway Improvements Phase 1.2A