River Bend Dr Pedestrian and Bicycle Enhancements

Job No:

2015-780

Services:

Concrete, Asphalt, Earthwork, Utilities

Owner: 

City of El Paso – Capital Improvements Department

Status:

Started February 12, 2016

Scope of Work:

The project supports the development of a pedestrian and bicycle corridor along River Bend Dr. between Frontera Rd. and Turnstone Dr. The project consists of a 12 ft. pedestrian and bicycle path with shade trees, vegetation and other amenities.  The corridor will provide connectivity to several existing neighborhoods, Braden Aboud Park and Zach White Elementary School. The total length of the pedestrian and bicycle corridor project is 5,633 feet and runs parallel to River Bend Dr.

Original Contract Time:

193 calendar days (6 ½ months)    Anticipated Completion Time: 5 months

Major Subcontractors/Suppliers:

Accent Landscape Contractors, Code Electric, Bowen Industrial Contractors, Pavement Markings Inc., Vertex Contractors, Paso Del Norte Materials, CEMEX.

SIMILAR PROJECTS

  • Roundabouts
  • Pedestrian Pathway Improvements Phase 1.2B
  • Independence Dr Pedestrian and Bicycle Enhancements
  • El Paso Int. Airport Runway
  • Santa Fe Pedestrian Improvements
  • Pedestrian Pathway Improvements Phase 2.1
  • City Site Work
  • Pedestrian Crossings
  • Pedestrian Pathway Improvements Phase 1.2A
  • Scenic Drive
  • Loop 375 Widening

Loop 375 Widening

CN:

2552-03-054

Services:

Concrete, Asphalt, Earthwork, Utilities

Owner:

TXDOT

Status:

Started March 28, 2016

Scope of Work:

Project consists of the construction of an additional travel lane in both directions on Loop 375, an auxiliary lane, high mast illumination, signing, pavement markings, delineators, metal beam guard fence adjustment and frontage road sidewalks.

Original Contract Time:

452 working days (20 months)    Anticipated Completion Time: 14 months

Major Subcontractors/Suppliers:

Tri-State Electric, Pavement Markings Inc., Traffic Control Specialist, Vertex Contractors, EGL Construction, Texas Far West, A-Brothers, Hardy Hole Drilling, South Texas Painting, Paso Del Norte Materials, CEMEX, Castillo Prestress.

SIMILAR PROJECTS

  • Roundabouts
  • Pedestrian Pathway Improvements Phase 1.2A
  • Independence Dr Pedestrian and Bicycle Enhancements
  • River Bend Dr Pedestrian and Bicycle Enhancements
  • Pedestrian Pathway Improvements Phase 2.1
  • El Paso Int. Airport Runway
  • Pedestrian Pathway Improvements Phase 1.2B
  • Pedestrian Crossings
  • City Site Work
  • Scenic Drive
  • Santa Fe Pedestrian Improvements