Job No:

2015-780

Services:

Concrete, Asphalt, Earthwork, Utilities

Owner: 

City of El Paso – Capital Improvements Department

Status:

Started February 12, 2016

Scope of Work:

The project supports the development of a pedestrian and bicycle corridor along River Bend Dr. between Frontera Rd. and Turnstone Dr. The project consists of a 12 ft. pedestrian and bicycle path with shade trees, vegetation and other amenities.  The corridor will provide connectivity to several existing neighborhoods, Braden Aboud Park and Zach White Elementary School. The total length of the pedestrian and bicycle corridor project is 5,633 feet and runs parallel to River Bend Dr.

Original Contract Time:

193 calendar days (6 ½ months)    Anticipated Completion Time: 5 months

Major Subcontractors/Suppliers:

Accent Landscape Contractors, Code Electric, Bowen Industrial Contractors, Pavement Markings Inc., Vertex Contractors, Paso Del Norte Materials, CEMEX.

SIMILAR PROJECTS

  • Pedestrian Pathway Improvements Phase 2.1
  • Scenic Drive
  • Pedestrian Pathway Improvements Phase 1.2A
  • Loop 375 Widening
  • City Site Work
  • Independence Dr Pedestrian and Bicycle Enhancements
  • Pedestrian Pathway Improvements Phase 1.2B
  • Pedestrian Crossings
  • Roundabouts
  • El Paso Int. Airport Runway
  • Santa Fe Pedestrian Improvements